At long last!
Cleveland Bridge is set to open partially from 6am on Monday 25th October for lighter vehicles of less than 2 metre width. However it will be single lane operation with traffic lights so queues are likely at peak times.
There appears to be lots of repairs still taking place under the bridge so two-way traffic is some way off still.